Academy · Shop operations
Track film rolls by the foot
- Video lesson, 1:40, captioned on screen
- For the owner and installers
- On every plan
- Checked 2026-11-15
Feet on the shelf, feet on the car and feet in the bin are three different numbers, and a job's margin depends on all of them. This lesson shows the owner and the installer how to track film rolls by the foot, at what each roll cost, from the day it arrives to the day it runs out.
The steps
Read the film position
Open Inventory, under Shop in the menu. The top of Overview shows On-hand value, Feet on hand, On order, 30-day COGS and 30-day waste. Value is counted roll by roll, at each roll's own cost per foot.
Receive a new roll
Press Receive roll and scan the label into Scan the roll's label with a USB scanner or the camera, or type the code off the box. Check the Product, enter Length (ft) and Cost / ft, and press Receive roll. That cost per foot stays with the roll until it is empty.
Print its label
Each roll has a page showing Remaining, Used, Total and Cost / ft. Press Print label and stick it on the roll, so the next scan finds this roll and no other.
Log the film on the job
On the job, under Materials used, press Log film used. Pick a roll, enter Feet used, set What for to On the car or Wasted, and press Log film. A mis-cut is waste and is charged to the job, so the job's margin shows what the install consumed.
Keep the offcut
On the roll's page, open Log consumption and set Reason to Remnant cut. The piece leaves the roll and lands on your remnant shelf, still carrying its cost.
Report factory-bad film
Haze, bubbles or adhesive trouble straight off the roll is the factory's fault. Open Report defect on the roll, enter the Length (in), Width (in) and Pieces, choose What was wrong, and press Report defect. It comes off the roll without touching the job, and appears under Inventory → Defects, ready for the manufacturer's rep.
Know when to reorder
Give each product a Reorder threshold (ft). When stock falls to it the product shows Reorder, and Create purchase order builds the order. Under Reorder alerts, tick Email me when film runs low.
What this lesson leaves out. A team member whose role hides inventory costs sees feet and rolls but no dollar figures. Film only counts against a job when somebody logs it, so a roll used and never logged still reads as full.
On every plan.
Read the transcript
How many feet are left on that roll of gloss? Know it without walking to the rack.
Open Inventory, under Shop. The rail up top is your film position:
value, feet on hand, what's on order, and thirty days of film cost and waste.
Value is counted roll by roll, at what each roll cost you.
New film in? Press Receive roll and scan the label with a phone camera or a USB scanner.
Check the product, then enter the length and the cost per foot. That cost stays with the roll until it's gone.
Every roll gets its own page: what's left, what's been used, its cost per foot, and its value on the shelf.
Print label, and the next scan finds it.
On the job, press Log film used. Pick the roll, enter the feet, and say whether it went on the car or was wasted.
A mis-cut is waste, and it's charged to the job.
Materials used lists every foot at that roll's own cost, so the job's margin includes what the film cost.
Log a cut as Remnant cut and the offcut lands on your remnant shelf, still carrying its cost.
Factory-bad film isn't waste. Report defect takes it off the roll instead of the job, ready for a manufacturer claim.
Set a reorder threshold on each product. When stock falls to it, the row says Reorder, and Create purchase order builds the order.
Under Reorder alerts, tick Email me when film runs low.
A mis-cut is the shop's cost. A bad roll is the manufacturer's. The defect list is the one their rep will ask for.
Three questions
Each answer is in the lesson above. Pick one to see why.
For every setting it touches, read the help guide: Inventory and rolls.
For what the feature does in a shop, see film inventory software.
Worth reading after it: How to track film inventory and Film waste calculator.
Tint shops
Set up for tint, then price it and sell it on the phone.
PPF shops
Set up for paint protection film, price a full front, and keep the waste down.
Wrap shops
Set up quoting by panel and by roll, and keep the film you stock in step.