Counting by eye
Where film goes when nobody counts it
A rack you can see is a rack you think you know. It holds up until a full body is on the lift and the roll everyone was sure about runs out at the B-pillar. Four leaks show up in shops that count by eye.
The cost is a memory
The per-foot figure on the quote is whatever somebody remembered from an invoice last spring. The next roll came in at a different price, and every job since has been costed on the old one.Remnants walk
Eight feet of the same film sits two racks over while a tech opens a fresh roll, because the offcut was set aside and written down nowhere.Waste has no number
Curved bumpers and tight window corners leave strips that cannot go on the next car. Unlogged, waste looks like nothing, and a number you have not seen is one you cannot bring down.The reorder is a panic
With no line in feet that says order now, film gets ordered when somebody notices the core, which is usually the morning a car is waiting.
The habits
Four habits, in the order film moves
Four habits close those leaks, and each happens at a moment the shop already stops for: the delivery, the end of an install, the bin by the plotter, the weekly order.
Receive the roll with its cost and lot
When the box is opened, give the roll a code and write down its starting length, width, lot number, rack and what it cost you landed, freight included. A label on the core with the code means nobody has to guess which roll is which later.Log each cut against a job
At the end of an install, record the feet pulled from that roll and the job they went on. The roll's count drops and the job carries the film's cost at that roll's price per foot.Sort every offcut: remnant or waste
A clean strip that can make a mirror cap goes back on the shelf as a remnant, at the cost per foot of the roll it came from. A strip that cannot be used is logged as waste with a reason, against the job that made it.Reorder from a line in feet
Each film gets a reorder point in feet, judged across every roll of it you hold. When the total crosses the line, the film goes on the order list while normal shipping still arrives in time.
The drawing below is the sample shop's rack in Service VIN: three rolls, one job taking 18 feet off roll R-1041, and that roll crossing its reorder line.
Example
Setting a reorder point you can defend
The reorder point is two numbers multiplied and a cushion added. How many days the supplier takes to deliver, times how many feet of that film you use a day, plus enough to cover a busy week.
Used while the order travels
7 days lead time at 40 ft a week
40 ft
Cushion for a heavy week
Half a week's use
20 ft
Reorder point
60 ft
In the example, the film is reordered when the rolls of it on the shelf add up to 60 feet. Judge it across every roll of the product: one roll down to 14 feet is not a reorder if a full one sits beside it. Revisit the line when the season changes, because a spring with three full fronts a week uses film at a different rate from a January.
Where to start
Win the job, from the first reply to the deposit.
The lead answered with openings from your calendar. The quote holds the slot. The deposit books the job.
The AI in it reads your own price book, calendar and customer records, so it answers and follows up without making things up. It runs beside your current software, with no data to move.
Defects
A flaw in the film comes off the roll
One kind of film leaves a roll and belongs to nobody's job: a gel, a haze or a line that was in the film when it arrived. Charge it to the job and that job looks like a bad install. Charge it to the roll, with its size, the kind of fault and a photo, and the list you hand the manufacturer's rep carries the roll code and lot for each claim.
What it adds up to
Three numbers a counted shelf gives you
Once every roll knows what it cost and every job knows what it pulled, three numbers fall out of the record without anybody adding them up at month end.
On-hand value
What the film on the rack is worth at the price you paid for each roll. It shows how much cash is standing on the shelf.Film cost per job
The film each job used, at the cost of the rolls it came from. Set beside the price, it shows which work pays, and it is the number that starts the next quote on the same car.Waste share
The part of film spend that went into the bin. Logged for a month, it tells you whether the plotter, the patterns or the habit of cutting long is costing more than you thought.
The film cost per job is where this guide hands over to pricing a PPF job from the roll up, which takes the per-foot figure, the feet pulled and the bay hours and turns them into a price. If you are setting up a shelf for the first time, the guide on how to start a PPF business covers what to stock before the first customer.
The software
Where the software carries the habit, and where it cannot
Service VIN's film inventory software keeps the four habits on the roll's own page. A roll is received with its length, lot, cost and rack, the phone camera reads the printed label and most manufacturer barcodes, a cut logged on the roll takes its feet off and puts that film's cost on the job, and the quote builder warns when a line needs more film than the shelf holds.
Window film works the same way as PPF, so window tint shop software built on rolls counts dyed, carbon and ceramic film on the same shelf, by the same foot.
Where it stops: a cut nobody logs is a cut it cannot count, so the shelf is only as good as the habit at the end of each install. A roll received without its cost has no margin to speak for. A wrong entry is corrected with a second one that says who fixed it and when, because the ledger only adds lines. A login without the cost permission sees feet and rolls with every price left off. And the quote warning is a warning: you can still send the quote and receive a roll before the install.
FAQ
What shops ask about counting film
How do I track PPF film inventory?
Make each roll the unit. Receive it with its length, width, lot, rack and the price you paid, log every cut against the job it went on, shelve usable offcuts as remnants and log scrap as waste with a reason. The roll's count drops with every entry, and each job carries the cost of the film it used.
Should I track film by area or by the foot?
By the foot. Film comes on rolls of a fixed width and is used along its length, so the linear foot is the unit you bought and the unit you have left. Square feet on the car is a smaller number that leaves out the offcuts.
How do I set a reorder point for film?
In feet, per product, judged across every roll of it you hold. Multiply your supplier's lead time by your daily use and add a cushion for a busy week. In this guide's example, a film that takes 7 days to arrive and goes at 40 feet a week, with a 20-foot cushion, is reordered at 60 feet.
What should I do with offcuts?
Sort them as they come off the plotter. A strip that can make a mirror cap or a door edge goes back on the shelf as a remnant, at the cost per foot of its roll, and the team checks that shelf before opening a fresh roll. What cannot be used is logged as waste against the job, so waste has a number you can watch.
Who pays for a defect in the film, the job or the roll?
The roll. Record the defect on the roll with its size, its kind and a photo, keep it off the job's film cost, and keep the list with roll code and lot for the manufacturer's rep.
How does Service VIN track film inventory?
Each roll is received with its length, lot, rack and cost, and each cut logged on it takes its feet off and puts that film's cost on the job. Offcuts go back on the shelf as remnants, scrap is logged as waste, a reorder point in feet puts a film on the reorder list, and defects come off the roll with an export for the rep. It counts only the cuts your crew logs.
Count one film this week
Pick the film you cut most, label its rolls, and log every cut on it for five working days. At the end of the week, the feet on the shelf and the feet on the jobs should add up to what you started with. Where they do not is the first leak to fix.
