The inputs
The four numbers under every PPF price
Four numbers sit under every PPF price. Three of them change from car to car, and the fourth changes every time a new roll comes in.
Film, per foot
The roll price divided by the roll's length. Take it off the invoice for the roll you will cut, freight included, because the next lot of the same film can land at a different price.Feet pulled
The length that comes off the roll for this car, with the offcuts you cannot reuse: the wheel-arch cutouts, the strip between two bumper pieces, the end of a nest too short for the next job.Bay hours, loaded
Wash, decontamination, trim off and back on, install, edges, the post-install check. Multiply by a loaded rate: wages and payroll costs plus rent, power and insurance, divided by the hours you can bill in a month.Supplies
Slip and tack solution, blades, squeegee edges, prep chemicals and the card fee on the payment. Small one at a time, and they add up on every job.
Example
One full front, priced line by line
Here is one full front on a midsize sedan, priced the way this guide describes. The figures are an example, chosen to show the arithmetic. The roll, the feet and the price are the sample shop's, the same ones our page on PPF shop software walks through.
- Film 27.9%
- Labor 23.7%
- Supplies 1.8%
- Kept 46.5%
Film
$1,700 roll ÷ 50 ft = $34 a foot × 18 ft pulled
$612
Labor
8 bay hours × $65 loaded rate
$520
Supplies
Slip, blades, prep chemicals, card fee
$40
Cost of the job
$1,172
Quoted price
$2,190
Kept, before tax
$1,018 · 46.5%
Quoted at $2,190, the job keeps $1,018, which is 46.5% of the price and $127.25 for each of the 8 hours it holds the bay. Count only the film and the same quote shows 72%. Both numbers are true. Only the first one has paid the installer.
When it goes wrong
Where the margin goes when the job runs long
The example assumes the job goes the way it was quoted. Two things go wrong on a full front more than anything else: the nest takes more film than planned, or the install takes longer. The price stays where it was, so the margin takes the whole hit.
| The job | Cost | Kept at $2,190 |
|---|---|---|
| As quoted | $1,172 | 46.5% |
| 4 more feet off the roll | $1,308 | 40.3% |
| 2 more hours in the bay | $1,302 | 40.5% |
| Both | $1,438 | 34.3% |
Neither change looks like much on the day. Together they take the example from 46.5% to 34.3%. That is the case for writing down the feet and hours each job took and checking them against the quote: the next quote on the same model should start from what happened.
Where to start
Win the job, from the first reply to the deposit.
The lead answered with openings from your calendar. The quote holds the slot. The deposit books the job.
The AI in it reads your own price book, calendar and customer records, so it answers and follows up without making things up. It runs beside your current software, with no data to move.
Setting the price
From a target margin back to a price
Working backwards from the margin you want is one line of arithmetic: price equals total cost divided by one minus the target. At 50%, the example's $1,172 of cost is quoted at $2,344. At 40% it is $1,953.33.
Packages for selling
Full front, track pack, full body. Customers ask for them by name and they quote in a minute. A package price is an average, though, and a compact hatchback and a full-size pickup are different amounts of film and time under the same name.Panels for checking
Keep a cost per panel underneath the package: feet and hours for a bumper, a hood, a pair of fenders on each size of vehicle. It prices the one-off rocker panel, and it shows which package on which vehicle is carrying less than the rest.Bay hours for choosing
When the calendar is full, margin per bay hour decides between two jobs better than the ticket size does. A full body that holds the bay for days has to earn more per hour than the full front it pushed out, or it was the smaller job.
To try your own numbers, the PPF margin calculator takes a price, the film and the hours; the PPF cost calculator shows what customers are told to expect for each package.
The roll
The roll price moves, so the foot price moves
The per-foot figure is the one that drifts without anybody noticing. One roll came in on a deal, the next at list, the one after with more freight on it. A cost per foot memorized last spring is out of date the day a roll lands at a new price.
So the cost belongs on the roll, written down when the roll arrives, and the quote should take it from the roll it will cut. On paper that is the cost per foot on the roll's label; in film inventory software it is a field on the roll's record. Coverage area is the other trap: what ends up on the car is less film than came off the roll, and pricing the coverage leaves the offcuts unpaid.
The software
What the quote screen does, and the half it leaves to you
Service VIN's live margin quoting does the film half of this arithmetic for you. Each roll is received into inventory with its length and the price paid, and a quote line takes its film cost from the roll it will cut, so the margin on the line and on the whole quote shows while you build it.
What it does not do is time the install or know your labor rate. The margin it shows is the price less the cost on each line: film from the roll, and labor only if you have put a labor cost on the service. A line with no cost on file shows its whole price as margin. It marks a line healthy from 50% and thin under 30%, and those bands mean what you have told it about your costs. The loaded rate is still your arithmetic, done once and kept up to date.
FAQ
Questions shops ask about pricing PPF
How do I work out the film cost of a PPF job?
Divide the price of the roll you will cut by its length to get a cost per foot, then multiply by the feet the car takes off the roll, offcuts included. In this guide's example, a $1,700 roll of 50 feet is $34 a foot, and a full front that pulls 18 feet carries $612 of film.
What labor rate should I use when pricing PPF?
A loaded rate, worked out from your own books: a month's wages and payroll costs, plus rent, power, insurance and the other fixed costs, divided by the bay hours you can bill in that month. It is higher than the installer's wage because each billable hour has to pay for the hours that are not billable.
Should I price PPF by package or by panel?
Sell packages and check them by panel. Customers buy a full front or a full body by name, and packages quote fast. Underneath, keep the feet and hours each panel takes on each size of vehicle, so you can price a single panel and see which package is carrying less margin than the others.
What margin should a PPF job carry?
There is no published industry figure we would stand behind, so set yours from what the shop has to carry. For reference, Service VIN's quote builder marks a line healthy from 50% and thin under 30%, after the costs that are on the line.
Does Service VIN put labor into the margin it shows?
Only if you put it there. Film cost comes from the roll the line will cut. Labor is included when the service carries a labor cost. A line with no cost on file shows its whole price as margin, so receive rolls at cost and set service costs before you trust the figure.
Run last month's full front through it
Take the roll price, the feet and the hours from a job you finished this month and work it through the four lines above. If the margin is not the one you thought you were charging for, the next quote is where it gets fixed.