Skip to main content

Vinyl wrap · Scheduling

A wrap shop scheduler that holds the bay for every day of the install

A wrap shop scheduler has to keep one bay for a job that runs for days. In Service VIN each wrap service carries its own booking time in open days, and the bay stays taken from drop-off to the close of the last one.

The short answer

How should a wrap shop scheduler book a color change?

In days on the schedule. Each wrap service carries a booking time of one to ten open days, so a three-day color change holds its bay from drop-off to the close of its third open day. Closed days are skipped, an overlapping booking on that bay is refused, and the labor estimate is kept apart.

  • Booking time is set per service, from 1 to 10 open days.
  • At a weekday shop, a three-day wrap dropped off Friday runs Friday, Monday and Tuesday.
  • The board, the booking form and the storefront read one window, so they agree about Monday.

A wrap service carries two lengths

The first is the labor estimate. It costs the job and sizes the block an installer sees on the board, and it changes the moment a bumper needs a second pass. Customers do not see it.

The second is booking time: how many open days the service keeps a bay off sale, from 1 to 10. A full color change might say three and a roof one. The shop sets both in the service editor from its own installers' times, so the person at the counter does not have to remember that a van takes longer than a coupe.

A car left overnight to settle after post-heat is not being worked on, and it still occupies the bay. A calendar that books hours shows that bay as free on the second morning.

A Friday drop-off, counted in open days

The booking's window runs to the close of its last open day, measured against the shop's own hours. Days the shop is closed are skipped, so a wrap does not eat the weekend or report itself finished on a Sunday.

Example, at a shop open Monday to Friday: a three-day color change dropped off Friday morning holds its bay Friday, Monday and Tuesday, and the bay is offered again on Wednesday. If the same shop also closed on Wednesdays, a three-day wrap dropped off Tuesday would run Tuesday, Thursday and Friday.

Bay 2, one week

Full color change, booking time 3 days

  1. FriDay 1 of 3
  2. SatClosed
  3. SunClosed
  4. MonDay 2 of 3
  5. TueDay 3 of 3
  6. WedOpen

A tint job dragged onto Bay 2 for Monday morning snaps back: the bay is held to the close of Tuesday.

Sample data. A shop open Monday to Friday; the three days are this shop's own setting for the service.

The second car that cannot go in

Each single-capacity bay carries a constraint on its booked time in the database. A booking that overlaps the held window cannot be saved, whether it comes from a drag on the board, the booking form, the online storefront or an integration, and a dragged job snaps back with the reason.

The storefront's day cap, the overlap count and the overbooking banner on the dashboard read that same window.

A drop onto a bay checks the installer too: skills, shift and time off. Meetings and days off sit on the same grid, and a lapsed certificate takes an installer off that brand's work in the scheduler and on the booking page.

Five vans that cannot leave the road together

Fleet work is approved before it is dated. Approved jobs with no date wait in the unscheduled tray beside the grid, and somebody drags each van into a stretch where a bay and an installer are both free. Each van is its own booking with its own booking days, so a long van can hold more days than a short one by the shop's settings.

Jobs are colored by service category, so the week reads from across the shop: the long wrap blocks in one color, the shorter tint and PPF jobs in others.

Moving a wrap is one drag. The reschedule path recomputes the window from the new start with the same count of open days, so the whole booking moves and the days it left go back on sale.

Three doors onto one calendar

Bookings reach this calendar from the counter, from a quote the customer approves, and from the online booking page. Which wraps to sell as bookable slots and which to keep quote-first is the subject of vinyl wrap online booking; how the job is priced before it gets a date is vehicle wrap estimating software.

The calendar is the one the whole shop runs on, set out on the shop calendar and bay scheduling page. The wider case for vinyl wrap shop software is on the trade page, and the plans and prices start at $79 a month, flat per shop. Shops weighing Mobile Tech RX can read Service VIN vs Mobile Tech RX, each row dated, and the field as a whole is in best vinyl wrap software.

What the scheduler leaves to you

Booking time counts whole open days, 1 to 10 per service. It reserves the bay; it does not track which panels are done inside those days, and the job's stage on the board is the coarser signal.

It does not plan a fleet's rollout. Approved vans wait in the tray until a person puts them on dates, and the right order is the shop's call.

The two-way Google Calendar sync is a beta, from Growth up. Changes made in Google arrive at the next sync, or when somebody presses Sync now.

Questions shops ask

Can one booking hold a bay for three days?

Yes. Set the service's booking time to three and every booking of it holds its bay through the close of the third open day. Closed days are skipped, and an overlapping booking on that bay is refused in the database.

Does a wrap dropped off on Friday take up the weekend?

Only if the shop opens on the weekend. The count follows your own hours, so at a weekday shop a three-day wrap dropped off Friday runs Friday, Monday and Tuesday.

What happens to the days if we push a wrap back?

Drag it to the new start and the window is worked out again from there, with the same number of open days. The days it left are free again on the board and the storefront.

Where does a consultation about a color go?

On the calendar as a consultation: in the shop, by phone, by video or on site. It is filed on the customer and takes no bay, so the install schedule around it stays open.

Does it sync with Google Calendar?

Both ways, in beta, from Growth up. Bookings go to Google Calendar and update when they move, and changes made in Google come back onto the job at the next sync.

Sources & notes

Facts checked

  1. 1.Booking time: 1 to 10 open days per service, the window run to the close of the last open day, closed days skipped, one window read by the storefront, the overlap count, the banner and the database (src/lib/scheduling/booking-days.ts).
  2. 2.The overlap refused in the database on a single-capacity bay, the snap-back, skills, shifts, time off, consultations and the Google Calendar sync, as the shop calendar's own page states them (/features/calendar-bookings).
  3. 3.The unscheduled tray, color by service category and the three doors bookings arrive through, carried over from the post this page replaced (wrap-shop-scheduler, published 2026-10-26).