One example week across two film bays
Bay 1 has a full body in it on Monday and Tuesday. Bay 2 is shut both days while its lift is serviced. A phone consultation and a warranty check-over sit beside the bays rather than in them, and Thursday's front clip is held for a customer whose deposit has not landed yet.
Example week
Sample data| Lane | Mon | Tue | Wed | Thu | Fri |
|---|---|---|---|---|---|
| PPF Bay 1 | Full body, day 1 of 2 | Full body, day 2 of 2 | Full front | Front clip, held for deposit | Open |
| PPF Bay 2 | Shut: lift service | Shut: lift service | Track pack | Open | Rocker panels |
| Consults | Phone, 30 min | Open | Open | In shop, 30 min | Open |
| Check-overs | Open | Open | Last month's full front | Open | Open |
Which bay may sell which service
Each service names the bays that can run it. A full front mapped to the two film bays is offered in those two and nowhere else, and a tint booking mapped to the glass bay stops counting against film bays it cannot use. A service that names no bay is held back from online sale until it does.
The same map is read at the desk and on the booking page, so both sell a bay the same way. How the customer's side of it looks is on PPF online booking software.
A bay keeps its own hours
A film bay can open later than the shop's front door, close a day a week, or shut for two weeks while a lift is serviced. Each bay holds its own hours and closures under Settings, Scheduling, Bays and stations, and the booking page reads them before it offers a time.
Coverage that runs past one day is set once on the service, from one booking day to 10. Closed days are skipped, so a job that starts before a shut day resumes on the next open one.
The slot promised before the money
A quote that takes a deposit can hold its slot. From that moment the slot is off sale online, the customer is told the time and the deadline, and the payment itself puts the job on the calendar at that time. If the deadline passes unpaid, the slot goes back on sale and the shop is told whose it was.
A customer who presses I've sent the e-transfer keeps the slot as if the money had arrived, while the deposit still shows as owed on the bill. Where that money is recorded is set out on invoicing software for PPF installers.
The installer the film maker trusts
A certification on an installer's profile carries the date it runs out. Inside 60 days of that date it shows as expiring and the manager is told. Once it lapses, and the service is marked as needing that brand's certificate, the booking page stops offering that installer's times for it, and the scheduler warns before anyone assigns them.
Work that takes no bay
A consultation is on the calendar and takes no bay: in the shop, by phone, by video or at the customer's address, 30 minutes unless you change it. The team books them; they are not offered on the booking page.
On Command, the one-month warranty check-over has its own lane too, so looking over last month's full front does not block this week's install. The lanes are lenses on one calendar, and a check-over shows only in its own.
Where the calendar stops
AI Scheduling, on Growth and up, ranks open slots by projected margin and leaves the booking to a person; it does not move a car on its own. The plans and what each one adds are on the pricing page.
A bay closure has to be entered before the booking page can respect it. A slot held for a deposit can be set to hold without telling the customer.
If you are weighing the calendar against another film shop tool, Service VIN vs Tint Wiz sets the two side by side, and the rest of the shop is on our PPF shop software page.
Questions shops ask
Can a full body keep its bay over a closed day?
Yes. Booking days count open days, so a day the shop or the bay is shut is skipped and the job carries on the next open day. A service can hold from one to 10 booking days.
What stops two people booking the same bay at the same time?
The database. A single-capacity bay holds one booking for a window, and the database refuses a second job on it. A booking-page booking that loses that race is kept without a bay for staff to place, instead of overlapping.
Can I shut one bay for a week without closing the shop?
Yes. A closure is set on the bay itself, with its dates, and the booking page stops offering that bay for those days while the other bays stay on sale.
Will the booking page give a job to an installer whose certificate ran out?
Not on a service marked as needing that certificate: the booking page leaves out the lapsed installer's times. At the desk the scheduler warns instead of blocking, and the manager is told before the date.
Do consultations use up an install bay?
No. A consultation sits in its own lane, 30 minutes by default, in the shop, by phone, by video or on site. Only the team can book one.
Sources & notes
Facts checked
- 1.Bay hours, closures and the database refusing a double booking. /features/calendar-bookings
- 2.Certifications with expiry dates on the team roster. /features/team-management
- 3.Slots ranked by projected margin, and the plan they are on. /features/ai-scheduling
- 4.Plan names and what each one includes. /pricing